WestchesterAI

Westchester Contractor Licensing and Permits, Town by Town

What a contractor needs to work legally in Westchester County: the county license, what your contracts must say, the state and federal rules that ride along, and how every building department in the county takes permit applications.

By Alex Colombo, WestchesterAI. Checked against official sources on October 21, 2026.

This is a plain-English summary, not legal advice. Your town's building department has the final word.

Why we wrote this.

We build and fix websites and follow-up systems for Westchester contractors, and these rules run straight through that work. The county wants your license number on your advertising, which we read as including your website and Google profile. Licenses, insurance certificates, and open permits all come with dates that are easy to miss when you're on a job. We couldn't find the official answers in one place, so we put them here, with a link to every source.

The short version.

  • Most home improvement work needs a county license.

    The Westchester County home improvement license costs $750 for two years. It covers work on homes of up to three units, and since July 2025 that includes HVAC and power washing.

  • Plumbers and electricians need their own county licenses.

    The home improvement license does not cover plumbing or electrical work. Those are separate county trade licenses.

  • Yonkers has its own license.

    Yonkers has its own home improvement license on top of the county rules. Check with the city before you take a job there.

  • Building departments check your paperwork.

    Many towns won't issue a permit without your county license, and New York requires real workers' comp and disability certificates. An ACORD form is not accepted as proof.

  • A permit isn't closed when the work is done.

    It closes when the town issues a certificate of occupancy or completion, which usually means passing every inspection first.

The county home improvement license.

Westchester County requires a license to advertise or do home improvement work on a house, condo, townhouse, or apartment building of up to three units. That includes anyone who arranges other contractors for a fee. The Department of Consumer Protection in White Plains issues it.

Work it covers

  • Kitchens and bathrooms, additional rooms, garages and carports

  • Roofs, siding, gutters, waterproofing, and storm or replacement windows and doors

  • Decks, patios, driveways, walkways, masonry, and fences

  • Interior and exterior painting, tile setting, and chimney maintenance

  • Landscaping, gardening, tree work, excavation, pools, and sprinkler systems

  • HVAC and power or pressure washing (added July 2025)

Work it doesn't cover

  • Plumbing and electrical work (separate county licenses, below)

  • Architectural services

  • Building a brand-new home

  • Selling goods without installing them

  • Work on state- or municipally-owned buildings

  • Employees of a licensed contractor, who are covered by their employer’s license

What you'll need to apply

  • A notarized application signed by the owner

  • Proof of your business name

    A business certificate, or your LLC or corporation filing receipt.

  • A liability insurance certificate

    Naming the Westchester County Department of Consumer Protection, 148 Martine Ave., Room 407, White Plains, NY 10601, as certificate holder, with your scope of work shown.

  • Workers' comp and disability certificates

    Form C-105.2 or U-26.3 for workers’ comp and DB-120.1 or DB-155 for disability, or a CE-200 exemption, naming the county department as holder.

  • Photo ID for every owner, officer, partner, and salesperson

  • A notarized child support certification

    Sole proprietors and partners only.

The county runs a background check. It can also require a bond of up to $50,000. The law leaves the minimum insurance amount to the department, so ask when you apply.

Fees since January 1, 2026

ItemFee
License, 2 years (renewal is the same)$750
Expedited processing (card only)$100
Vehicle decal, each$10
Late renewal$50
Duplicate certificate$50

How long it takes: about 60 business days, or 7 business days with expedited processing.

How to apply: by mail, at the lobby drop box at 148 Martine Avenue in White Plains, or in person by appointment. Email and fax applications are not accepted. Questions go to (914) 995-2155, weekdays 9 to 4.

Check a license: county license lookup

Working without one

Unlicensed work is a misdemeanor in Westchester. Civil penalties run up to $5,000 for a first violation, $10,000 for a second within five years, and $15,000 for a third within ten years, and each day can count separately. The county can also impound vehicles and tools used on the job.

What every contract must say.

In writing, in plain English, signed by everyone, with a copy to the homeowner before work starts. Change orders count too. Deposits go into escrow (or are covered by a bond), and you tell the homeowner in writing where the money is held. Homeowners can't waive these protections.

The county's sample contract (PDF)
  • Your name, address, phone number, and county license number

  • Approximate start and substantial-completion dates

  • A description of the work and the materials, including make and model

  • The lien law notice, and the escrow notice for the homeowner's deposit (or a bond in its place)

  • A progress payment schedule tied to stages of the work, if there are progress payments

  • Your insurance, and your subcontractors', with each insurer's name, address, and phone

  • The homeowner's right to cancel within 3 business days

Your license number, decals, and trucks.

  • Your license number goes on everything.

    The county law lists all advertising, stationery, proposals, change orders, invoices, and contracts. We treat your website, your Google profile, and your truck lettering as advertising too.

  • Every vehicle gets a county decal.

    The county asks for it on the rear bumper, driver’s side.

  • Trucks at the job show your name and address.

    On both sides, readable from 50 feet, on any vehicle that brings tools, materials, or workers to a Westchester job site.

  • Tell the county about changes within 10 days.

    In writing, when your business name, address, ownership, or responsible people change.

Plumbers and electricians.

Plumbing and electrical licenses are issued countywide by the same department's Trades Licensing Division, not by your town. Towns still issue the permits, but only to county-licensed masters or the people working under them.

A master electrician license is $500 and renews every year by December 31. A master plumber license is $600 a year, and plumbing renewals are due 60 days before the license expires. Late fees apply to both, and after a deadline passes you may have to appear before the licensing board.

Some towns don't issue electrical permits at all and use approved private inspection agencies instead. Mount Kisco is one. Check before you start.

Look up a plumbing or electrical license

Yonkers is different.

Yonkers has its own home improvement license on top of the county rules, required before you renovate a one- to three-family home there.

Call the city at (914) 377-3000 before you bid a Yonkers job. Ask whether you also need the county license, and about the fee, the insurance minimum, and how long approval takes.

State and federal rules that come with the job.

New York has no statewide home improvement license, but these four rules apply in every Westchester town.

  • Workers' comp and disability proof for every permit

    New York requires towns to confirm workers' comp and disability coverage before issuing a permit. Bring the state forms (C-105.2 or U-26.3, plus DB-120.1) or a CE-200 exemption. The name and FEIN must match your application exactly. ACORD certificates are not accepted.

  • An asbestos survey before renovation or demolition

    New York requires a survey by a certified asbestos inspector before renovation, remodeling, repair, or demolition work, and the Department of Labor says it applies regardless of when the building was built. For demolition, a copy goes to the town issuing the permit.

  • Lead-safe certification for pre-1978 homes

    The EPA requires a certified firm and a certified renovator for paid work that disturbs paint in homes built before 1978, including one-person businesses. Jobs that disturb 6 square feet or less per room inside, or 20 square feet or less outside, are exempt, but window replacement is always covered.

  • State contract rules on jobs over $500

    New York's home improvement contract law also requires a written contract, the 3-day right to cancel, and the escrow and lien notices. Missing them can cost up to $2,500 per contract.

What usually needs a permit.

Across the town pages we read, these usually need a permit: structural work, additions, decks, sheds and garages, pools and hot tubs, plumbing, electrical, HVAC and heating equipment, generators, oil tanks, windows, and finished basements. Painting, flooring, carpet, and other cosmetic work usually doesn't.

Roofs and fences are where towns split. Scarsdale lets you replace roof shingles without a permit; Greenburgh requires one for roof covering on one- and two-family homes. Greenburgh doesn't require a permit for fences within its height rules; North Salem and Pelham require one for any new fence. When in doubt, call the number in the table below.

Every building department in the county.

How each of Westchester's 43 building departments takes permit applications. 15 list online applications (5 of those need confirming). Phone numbers come from each department's own page. Where a town's site wouldn't let us read it directly, the row says to confirm by phone.

MunicipalityApplicationsHowPhone
ArdsleyVillagePaper or in personDownload or pick up formsConfirm by phone(914) 693-1550
BedfordTownOnlineApply, pay, and check status online (CitySquared)(914) 666-8040
Briarcliff ManorVillagePaper or in personPDF forms(914) 944-2770
BronxvilleVillagePartly onlinePaper originals; fees can be paid online(914) 337-7338
BuchananVillagePartly onlinePaper; fees can be paid online(914) 293-8395 (inspectors)
CortlandtTownOnlineOnline (OpenGov)(914) 734-1010
Croton-on-HudsonVillagePaper or in personPDF forms(914) 271-4781
Dobbs FerryVillageOnlineOnline (CitySquared)Confirm by phone(914) 231-8513
EastchesterTownPaper or in personPDF forms(914) 771-3317
ElmsfordVillagePaper or in personMail, or drop off at Village Hall by 4 pm(914) 345-1553
GreenburghTownPartly onlineIn person or mail; fees can be paid online(914) 989-1560
HarrisonTown/VillagePartly onlineIn person or mail; an older notice mentions online filing for some permit typesConfirm by phone(914) 670-3050
Hastings-on-HudsonVillageOnlineOnline (Cloudpermit)(914) 478-3400 ext. 613
IrvingtonVillagePartly onlineAdministrative permits online (Cloudpermit)(914) 591-8335
LarchmontVillagePaper or in personTwo hard copies of plans(914) 834-4349
LewisboroTownOnlineOnline (CitySquared); in person and mail alsoConfirm by phone(914) 763-3060
Mamaroneck (Town)TownOnlineOnline (OpenGov)(914) 381-7830
Mamaroneck (Village)VillagePaper or in personPaper applications; online parcel history only(914) 777-7731
Mount KiscoTown/VillagePaper or in personNo online portal listed(914) 864-0019
Mount PleasantTownOnlineOnline only (OpenGov); paperless since July 2026(914) 742-2305
Mount VernonCityOnlineOnline (OpenGov)(914) 665-2483
New CastleTownPaper or in personDoes not accept electronic submissions(914) 238-4723
New RochelleCityOnlineApply online (CitySquared); hard copies and payment still required(914) 654-2035
North CastleTownPartly onlineListed permit types by email; card payment by phone(914) 273-3000 ext. 44
North SalemTownPaper or in personNo online portal listed(914) 669-5952
Ossining (Town)TownPaper or in personIn person at the Operations Center(914) 762-8419
Ossining (Village)VillageOnlineOnline only (Municity / CitySquared)Confirm by phone(914) 941-3199
PeekskillCityPartly onlineMail or City Hall drop box; fees can be paid online(914) 734-4140
Pelham (Village)VillagePaper or in personPaper; online property records only; new portal announced for early 2027(914) 738-2258
Pelham ManorVillagePaper or in personIn person, weekdays 9 to 4(914) 738-8820
PleasantvilleVillagePaper or in personNo online portal named; call or visit(914) 769-1926
Port ChesterVillageOnlineOnline (Accela); in person and mail also(914) 939-5203
Pound RidgeTownPartly onlinePDF application; plans uploaded online once you have an application numberConfirm by phone(914) 764-4635
Rye (City)CityPartly onlineNo portal; PDF materials submitted digitally or by mailConfirm by phone(914) 967-7372
Rye BrookVillagePartly onlineOnline portal (Cloudpermit) announcedConfirm by phone(914) 939-0668
ScarsdaleTown/VillagePaper or in personPDF applications, submitted in duplicate(914) 722-1140
Sleepy HollowVillagePaper or in personDownloadable forms(914) 366-5124
SomersTownPaper or in personBuilding permits by appointment(914) 277-3539
TarrytownVillageOnlineOnline only (SmartGov)Confirm by phone(914) 631-3668
TuckahoeVillagePaper or in personPaper only; no online payments(914) 961-8148
White PlainsCityOnlineOnline (CitySquared); notarized paper also accepted(914) 422-1269
YonkersCityOnlineOnline filing (CitySquared)Confirm by phone(914) 377-6500
YorktownTownOnlineOnline (CitySquared) or in person(914) 962-5722 ext. 233

10 rows say “Confirm by phone” because those sites blocked a direct read. The county's contact list has no separate department for the Town of Rye or the Town of Pelham; their villages run their own. Spotted something out of date? Tell us at info@westchesterai.com and we'll fix it.

How long review takes, where towns say.

We found a published review time for only seven departments. Everywhere else, ask when you file, and don't assume one town's pace applies to the next.

  • Bronxville

    “Our normal review lead time is 3 weeks.”

  • Larchmont

    “Applications typically take approximately 3-4 weeks to review.”

  • Mount Pleasant

    “Permits can take up to 4 to 6 weeks.”

  • North Castle

    A goal of 2 to 4 weeks for the first plan review, and up to 2 to 3 weeks for re-reviews.

  • Peekskill

    Processed in the order received; “can take up to two weeks.”

  • Pleasantville

    “Most permits take five to seven days.” New residential plan review takes about three weeks.

  • Scarsdale

    Plan review after Board of Architectural Review approval is “about 4 weeks depending on the workload.”

Closing permits, and other things that trip people up.

Passing the final inspection doesn't close a permit. In Scarsdale's words, only the certificate of occupancy does. Some towns, including Eastchester, Mount Pleasant, and the Town of Ossining, also want a notarized final cost affidavit before they issue one.

  • Some towns require you at the inspection.

    White Plains says the contractor must be present at each mandatory inspection. North Castle asks for inspection calls the day before.

  • Starting without a permit costs more later.

    Bedford charges $1,000 plus the original fees to legalize work. Pleasantville charges the permit fee plus $1,000. North Salem triples the permit fee for starting early.

  • Applications can expire.

    Mount Vernon voids applications that sit dormant for six months.

  • Villages often want to be named on your insurance.

    The Village of Mamaroneck, Pelham Manor, Tuckahoe, Larchmont, Hastings, and Croton ask for the village as additional insured and certificate holder.

  • Watch for fake building department calls.

    The Town of Ossining, Pelham, Tuckahoe, Dobbs Ferry, and Irvington all warn about scam calls, texts, and payment links that claim to come from the building department.

  • Cite the current code.

    Mount Pleasant returns applications that cite the 2020 code as incomplete.

Keeping all of this from slipping.

None of this is hard. It slips because it's spread across dates, towns, and certificates while you're busy on a job. The setup that prevents most problems is small and uses tools you already have.

AI chat tools like ChatGPT or Claude are good at turning your notes into a clear scope of work, or summarizing a town checklist you paste in. They are not a reliable source for which code edition, fee, or form a town wants today. Check that on the town's page or by phone.

  • One list of every license and certificate, with its expiration date.

    Your county license (every two years, and the county stops accepting renewals 60 days after it expires), any electrical license (every December 31), any plumbing license (renew 60 days before it expires), your workers’ comp and disability certificates, and each insurance certificate a village asked for.

  • A reminder 60 days before each one.

    To your phone or email, from a calendar or a spreadsheet you already use. No new software needed.

  • An open-permit list.

    Permit number, town, last inspection, and what is still needed to close it. Open permits come back at resale time, and they are easy to forget.

  • A contract template with the required items built in.

    Start from the county’s sample contract and have your attorney review it once. Then every estimate goes out complete.

  • Your license number on your website and Google profile.

    The county requires it on advertising, and we treat your website as advertising. Adding it is a small fix.

Want the reminders set up for you?

A 15-minute call. We'll look at how you track licenses, certificates, and open permits now, and tell you the smallest setup that keeps them from slipping.

Next availableWestchester County, NY
  • 15 MINIntro callFree. Pick a time that suits you online.
  • CALLCall or text Alex(914) 361-9414
  • 1 DAYWritten replyWe aim to answer messages within one business day.