New York permit paperwork: workers’ comp, ACORD forms, and asbestos surveys

The certificates a building department needs before it issues a permit, why an ACORD form gets sent back, the asbestos survey before renovation, and the EPA’s lead-safe rule.

Why we wrote this

One wrong insurance form can send a permit application back. These rules are statewide, and the official answers are spread across the Workers’ Compensation Board, the Department of Labor, and the EPA. This guide puts them in one place, with a link to every source. For the county license and how each Westchester building department takes applications, see our Westchester license and permits guide.

The short version

  1. Towns have to check your coverage before they issue a permit.

    New York’s workers’ comp law requires every town, village, city, and county to confirm workers’ comp and disability coverage, or an exemption, for new permits and renewals.

  2. An ACORD certificate doesn’t count.

    The Workers’ Compensation Board says ACORD forms are not acceptable proof of New York workers’ comp coverage. Towns want the state forms.

  3. The forms: C-105.2 or U-26.3, plus DB-120.1, or a CE-200.

    An insured business’s carrier sends the certificates to the building department on request. Self-insured businesses get theirs from the Board, or from their group’s administrator. A business that’s exempt files a CE-200 online.

  4. The name and FEIN have to match exactly.

    The business name and federal ID number on the form must match the business applying for the permit.

  5. An asbestos survey comes before renovation or demolition.

    The Department of Labor says a certified asbestos inspector surveys the building first, whatever year it was built. Condemned, structurally unsound, unsafe buildings are the exception, below.

Workers’ comp and disability proof

New York’s Workers’ Compensation Law, sections 57 and 220, requires every state agency, county, city, town, and village to make sure a business has workers’ comp and disability and paid family leave coverage, or a valid exemption, before it issues a permit, license, or contract. That covers renewals too. You prove it with state forms, and the business name and federal ID number on each form have to match the applicant exactly.

Which form, by how you’re covered

  • Insured through a private carrier

    Workers’ comp: C-105.2, from your carrier or a licensed New York agent

    Disability and paid family leave: DB-120.1, from your carrier

  • Insured through the State Insurance Fund

    Workers’ comp: U-26.3, the State Insurance Fund’s version

    Disability and paid family leave: DB-120.1, from your carrier

  • Self-insured

    Workers’ comp: SI-12, from the Board’s Self-Insurance Office, (518) 402-0247. Group self-insurance members: SIG-105.2, from the group’s administrator

    Disability and paid family leave: DB-155, from the same office

  • Not required to carry the coverage

    Workers’ comp: CE-200, a certificate of attestation of exemption, through New York Business Express

    Disability and paid family leave: The CE-200 covers whichever requirements you’re exempt from; eligibility is set separately for each

The Board can’t issue insurance certificates to an insured business. Ask your carrier or agent, and they send the form to the government office. Self-insured businesses request SI-12 and DB-155 from the Board’s Self-Insurance Office, and group members request SIG-105.2 from their group’s administrator. Questions about the rule and proof of coverage: (866) 546-9322. Compliance questions: (866) 298-7830. A business with a final penalty from the Board goes on a debarment list and can’t be awarded a public works contract by any New York municipality for a year.

Why an ACORD certificate gets rejected

An ACORD certificate is the insurance industry’s standard certificate of insurance. In the Board’s words, ACORD forms “are not acceptable proof” of New York workers’ comp coverage under section 57, and several Westchester building departments repeat that on their own pages. Ask your agent for the state forms by name:

A message to send your insurance agent, if you’re insured

“Please send our New York workers’ comp certificate (Form C-105.2, or U-26.3 if we’re with the State Insurance Fund) and our disability and paid family leave certificate (Form DB-120.1) to the [town] Building Department, [address]. The name and FEIN need to match our permit application exactly. An ACORD certificate doesn’t satisfy the workers’ comp proof requirement.”

Many villages also want your liability certificate to name the village as certificate holder and additional insured. Our permits guide lists the ones that say so.

Exempt? The CE-200

A business that isn’t required to carry one or both coverages files a Certificate of Attestation of Exemption, Form CE-200, online through New York Business Express (opens in a new tab). It takes a NY.gov business account. The application has two paths: apply as a business, or apply as a homeowner, for people getting permits to work on their own residence. You get an email when the certificate is issued, then print, sign, and submit it with the permit application.

The asbestos survey

The Department of Labor’s asbestos rule, Industrial Code Rule 56, requires an asbestos survey before all interior and exterior renovation, remodeling, repair, and demolition work. The property owner gets the survey before work begins.

  • Who does the survey

    A certified New York State asbestos inspector, who identifies the asbestos-containing material that the work may disturb.

  • Where the survey goes

    For demolition, a copy goes to the town issuing the demolition permit and to the Department of Labor’s district office for the area.

  • Newer buildings aren’t off the hook

    The rule lists exemptions, including buildings built on or after January 1, 1974, but those buildings must be treated as containing asbestos unless a survey shows otherwise, and federal rules still apply. The department’s summary: surveys are required regardless of construction date.

  • Who may remove it

    Only licensed asbestos contractors using certified asbestos workers. General contractors, plumbers, electricians, roofers, and other trades without an asbestos handling license may not disturb or remove it.

  • The homeowner exception

    An owner-occupied single-family home where the homeowner alone does the work. A building slated for demolition or certified unsound doesn’t count as occupied.

  • Condemned, unsafe buildings

    The Department of Labor says a survey can’t be done in condemned, structurally unsound, and unsafe buildings. Those are treated as containing asbestos and demolished by licensed asbestos contractors. If you’re not sure a building qualifies, ask the district office.

Where asbestos often turns up

  • Fireproofing, and insulation on pipes and boilers
  • Plaster, wallboard, and joint compound
  • Putties, caulks, paints, and cements
  • Floor and ceiling tiles
  • Siding shingles, roofing shingles, and tars

Westchester is in the Department of Labor’s New York City asbestos district: (212) 775-3532, NYCACB@labor.ny.gov. The Asbestos Control Bureau (opens in a new tab) also lists licensed asbestos contractors.

Lead-safe work in pre-1978 homes

The EPA’s renovation, repair, and painting rule applies on top of the state rules, in every town.

  • Who it covers

    Anyone paid to do work that disturbs paint in homes and child-occupied facilities, such as schools and child care centers, built before 1978. That includes every firm, even sole proprietors, and trades like plumbers, electricians, carpenters, and painters.

  • What it requires

    EPA or state certification for the firm, certified renovators, pre-renovation education for the occupants, and lead-safe work practices. Firms can’t advertise or do covered work without it.

  • Small jobs

    Disturbing 6 square feet or less of paint per room inside, or 20 square feet or less outside, is exempt as minor repair. Window replacement and demolition of painted surfaces are always covered, whatever the size, and practices the rule prohibits stay prohibited on any size job.

  • What it doesn’t cover

    Homes built in 1978 or later, and housing for elderly or disabled people or zero-bedroom units like studios, unless a child under six lives there or is expected to.

A permit-day checklist

Before you file, make sure you have:

  • Workers’ comp: C-105.2 or U-26.3 sent by your carrier, or SI-12 or SIG-105.2 if self-insured, or a CE-200
  • Disability and paid family leave: DB-120.1 from your carrier, or DB-155 if self-insured, or a CE-200
  • The business name and FEIN on every form match the permit application exactly
  • Your county license card, and the liability certificate naming the town if it asks
  • An asbestos survey by a certified inspector for renovation, repair, or demolition (condemned, structurally unsound buildings: ask the Department of Labor)
  • Lead-safe firm and renovator certification, when the work disturbs paint in a pre-1978 home and the rule applies

Certificates expire. Note each one’s expiration date, and ask your agent for new state forms before a permit stalls on an old one.

Sources

Spotted something out of date? Tell us at info@westchesterai.com and we’ll fix it.

Want the certificate dates tracked for you?

A 15-minute call. We’ll look at how you track insurance certificates, licenses, and open permits now, and suggest a practical way to keep the dates in view.

Book a 15-minute call